Civil Engineering Reference
In-Depth Information
30.2 k
30.2 k
Δ
Δ
5.0 '
5.5 '
16 '
V dyn
M dyn
FIGURE E4.7
concrete deck slab is required (Figure E4.7).
9040 in. 4 ,
I B =
n
=
8,
16 ( 7 3 ) ]=
H
= ( 8 )( 9040 )/ [
13.18 in./ft,
0.4
13.18
12
2.50
1
2.50 +
D M =
+ 2.50 / 16 ( 13.18 )
+
=
2.72 ft, use 2.50 ft,
1
D V =
d
=
2.50 ft, and
P
=
1.15 ( 80 )( 2.5 )/ 5
=
46.0 kips (for both shear and moment calculations).
Considering dynamic effects :
RE
=
0.20 W( 5 )( 100 )/ 16 W
=
6.25%,
I V =
39.5%( Figure 4.9),
P LL+I =
0.90 ( 1
+
0.063
+
0.395 ) 46.0
=
60.3 kips ( 30.2 kips for each rail ) ,
V LL+I =
30.2 kips, and
M LL+I = ( 5.5 ) 30.2
=
166.1 ft-kips.
4.4 OTHER STEEL RAILWAY BRIDGE DESIGN LOADS
Inadditiontodeadloadandliveloadeffects,environmentalforces(wind,thermal,and
seismic events) and other miscellaneous forces related to serviceability and overall
stability criteria must be considered in the design of steel railway bridges.
 
 