Environmental Engineering Reference
In-Depth Information
CASE 2
Figure 30. Graphical Presentation of the Priority List for the Case 2.
Case 2 is devoted with the constrain expressed with the relation
Case 2:
IC > CP = PC = MP
The sudden change of the Income Company indicator has affected the
priority list rating so that Option 2 be followed by Options 1,3 and 4.. The
maximum change of the Income Company indicator leads to the catastrophic
event caused by the overriding of the respective value of the indicator with
other indicators having the same value. Resilience Index as the measure of the
stability of the management system and results in the occurrence of the
unexpected invents.
CASE 3
Figure 31. Graphical Presentation of the Priority List for the Case 3.
Case 3:
PC > IC = CP = MP
Search WWH ::




Custom Search