Table 11. Option Indicators
Option
Company profit
CP
Income of
company
IC
Product cost
PC
Company
manpower
MP
ΔEuro/y/
Euro/y %
ΔEuro/y/
Euro/y %
ΔEuro/y/
Euro/y %
ΔManpower/
Manpower %
Option 1
15
10
5
0
Option 2
10
15
10
5
Option 3
5
5
15
10
Option 4
0
0
0
15
Graphical presentation of the cases is presented in the following figures. It
is of interest to emphasize individual cases.
CASE 1
Figure 29. Graphical Presentation of the Priority List for the Case 1.
Case 1 is devoted with the constrain expressed with the relation
Case 1:
CP > IC = PC = MP
Result obtained is giving priority to the Option 1 followed by the Option
2, Option 3 and Option 4. It is of interest to notice that even priority is given to
the Maximum Company Profit Change the effect of the other indicator
changes has proved substantial influence to the finale result. In the case the
change of company profit parameter will override the maximum change of
company profit the catastrophic event will occur. Even this option represents
the changes of other indicators the catastrophic event will not necessary occur.