Environmental Engineering Reference
In-Depth Information
Peat, funnel-and-gate PRB
system
Funnel trench W × L × D
(0.6 × 27 × 5 m), gate
W × L (2 × 4 m) variable
depth (slope surface)
Petroleum hydrocarbon
South eastern
Australia
$71,500 to construct
(no operating and maintenance
cost)
Guerin et al. (2002)
Nitrate-enhanced
bioremediation
Jet fuel
(toluene, xylene,
ethylbenzene)
Air force
demonstration,
EglinAir Force
Base, FL, USA
$160-$230/gal fuel removed
DuTeaux et al. (1996)
Electronically induced
redox barriers
TCE
F.E. Warren Air
Force Base, WY,
USA
Normalized to the cross-sectional
area of the e-barrier capital costs:
$409/ft 3 /year and operating and
maintenance cost:$10/ft 3 /year
FRTR (2007a)
Intrinsic remediation or
natural attenuation
Natural attenuation is
conirmed (unfavorable
for heavy metals)
No capital or operating and
maintenance costs other than
long-term monitoring
Source remediation via
nano ZVI injection
Dechlorination of DNAPL
contaminants
Cost varies depending on depth,
nature and quantity of
contaminant, and local geology.
$250,000-$300,000 per site (based
on pilot trials)
Cundy et al. (2008)
Pump-and-treat technology
(P&T) system augmented
with in situ bioremediation.
The treated groundwater
was oxygenated and
amended with nitrogen
and phosphorus before
reinjection
1,2-DCA, VC, and benzene
French Ltd., TX, USA
Capital cost per volume of
groundwater treated Per Year
$200/1000 gallons;
Average annual operating cost per
volume of groundwater treated
per year $43/1000 gallons
USEPA (1999a,b)
continued