Resources
a
Cost
b
Activity ID Activity Title
Laborer Forman Carpenter Excavator
1290
1st floor: hang doors & windows
—
—
—
—
$5,200
1300
1st floor drywall
—
—
—
—
$6,500
1310
1st floor HVAC air handler
—
—
—
—
$4,000
1320
1st floor suspended ceiling
—
—
—
—
$7,500
1330
1st floor plumbing: install fixtures
—
—
—
—
$7,500
1340
1st floor paint/wall covering
—
—
—
—
$5,700
1350
1st floor electrical finish
—
—
—
—
$15,000
1360
1st floor flooring
—
—
—
—
$11,000
1370
2nd floor: hang doors & windows
—
—
—
—
$4,200
1380
2nd floor drywall
—
—
—
—
$7,000
1390
2nd floor HVAC air handler
—
—
—
—
$4,000
1400
2nd floor suspended ceiling
—
—
—
—
$7,500
1410
2nd floor plumbing: install fixtures
—
—
—
—
$7,500
1420
2nd floor paint/wall covering
—
—
—
—
$5,400
1430
2nd floor electrical finish
—
—
—
—
$17,000
1440
HVAC: Install equipment
—
—
—
—
$22,000
1450
2nd floor flooring
—
—
—
—
$8,500
1460
Stucco & Paint to exterior walls
—
—
—
—
$7,000
1470
Site work
—
—
—
—
$30,000
1480
Plumbing finish
—
—
—
—
$4,500
1490
HVAC thermostat & test
—
—
—
—
$5,000
1500
Electrical final
—
—
—
—
$9,500
1510
Building cleanup
3
1
—
—
$200
1520
Final check/CO
1
1
—
—
$0
a
Resources for the general contractor's self-performed activities. The author has used only three labor categories and
one equipment category for the sake of simplicity.
b
When used for self-performed activities, it reflects the general contractor's materials cost only (total cost excluding
labor and equipment). For subcontracted work, the cost includes all expenses.
Assignment 2
Do the following:
1.
Make a copy of the Tampa Office Building-01 project. Call it “Tampa Office
Building-02.” Add all the information mentioned in the preceding table to
the schedule.
2.
Print the following reports:
a.
A tabular report showing the quantity of each resource used by each activity.
You may need to use a filter to select activities with resources (Responsibility
= GC).
b.
A tabular report showing the cost (in dollars) for all activities. Organize it
by Responsibility.
c.
A tabular report showing the cost (in dollars) for all activities. Summarize
it by Responsibility.
d.
A tabular report showing cost per month. Organize it by Responsibility.