Construction costs
∼
85% to 95% of total capital project costs.
•
Design costs
∼
5% to 10% of total capital costs.
•
Geotechnical costs
∼
0.1% to 4% of total capital costs.
•
Each peaks at different phase as shown in Figure 1.1.
Figure 1.1
Steps in effective use of geotechnical input throughout all phases of the project.
1.3 Relevance of scale
•
At each stage of the project, a different scale effect applies to the investigation.
Table 1.3
Relevance of scale.
Size study
Typical scale
Typical phase of project
Relevance
Regional
1: 100,000
Regional studies
GIS analysis/Hazard assessment
Medium
1: 25,000
Feasibility studies
Land units/Hazard analysis
Large
1: 10,000
Planning /IAS
Terrain/Risk assessment
Detailed
1: 2,000
Detailed design
Detailed development.
Risk analysis
•
GIS - Geographic Information Systems
1.4 Planning of site investigation
•
The SI depends on the phase of the project.
•
The testing intensity should reflect the map scale of the current phase of the study.