- Works within 5 m of high-voltage cables.
- Works with an immediate danger or drowning.
- Well-sinking, underground earthworks and tunnelling.
- Working with diving equipment.
- Working under compressed air.
- Works, in which explosives of detonating cords are used.
- Erection or demolition of massive construction elements with an individual weight
of more than 10 t.
- Production of a file for later works about the constructed facilities, when more than one
employer is employed.
The already mentioned duties of clients according to BaustellV are summarised in Table 8-1:
Table 8-1 Overview of the measures to be undertaken according to the BaustellV depending on the
conditions on site [240a].
Site conditions
Measures to be undertaken according to BaustellV
Em-
ployer
Work-
ing
days
Em-
ployed
Per-
son-
days
Dan-
gerous
works
ArbSchG
ยง4
Prior
notice
Coordi-
nator
Health
and safety
plan
File
1
< 31
< 21
< 501
no
yes
no
no
no
no
1
< 31
< 21
< 501
yes
yes
no
no
no
no
1
> 30
> 20
> 500
no
yes
yes
no
no
no
1
> 30
> 20
> 500
yes
yes
yes
no
no
no
> 1
< 31
< 21
< 501
no
yes
no
yes
no
yes
> 1
< 31
< 21
< 501
yes
yes
no
yes
yes
yes
> 1
> 30
> 20
> 500
no
yes
yes
yes
yes
yes
> 1
> 30
> 20
> 500
yes
yes
yes
yes
yes
yes
The introduction of the BaustellV, in addition to the main intention of improving the health
and safety protection of employees, is intended to have the following positive effects:
- Improved cost transparency, since all necessary facilities to be used communally and
whose subsequent consideration would make the project more expensive are already
included in the tender.
- Optimisation of the construction schedule since interruptions are avoided, the deadline
risk is reduced and the quality of the work performed is improved.
- Reduction of later maintenance and repair work since the necessary advance measures
for later works to the structure have already been looked after in the design phase and
documented in a file.
8.6.2 The tools of the construction site regulations
The prior notice provides the basis for the production of the health and safety plan on
every construction site. It is a binding statement and recognition by the client of the Bau-
stellV and a declaration of the intention of complying with its provisions.