Civil Engineering Reference
In-Depth Information
Chapter 6 introduces matching of load with generation, grid interaction,
and advanced control issues for Net ZEBs. Since the load profile of such
buildings often peaks at different times from the generation peak, it is
important to study this mismatch and how it can be addressed in order to
optimize the interaction with electricity grids by shifting and reducing peak
demand.
Chapter 7 provides detailed information about four diverse Net ZEBs
( Figure 1.1 ) , which are summarized in Table 1.2 . These high-quality case
studies were selected because they have at least one year of high-resolution
measured data and the authors were intimately involved in all of them
from conception to operation. The aim of this chapter is to draw lessons
from the case studies, the design and simulation tools used and their gaps,
and finally the technologies used and their integration. The last section
of each of the case studies examines the redesign of archetype buildings
based on additional information, new technologies, and lower material and
component costs since they were built.
 
Search WWH ::