Environmental Engineering Reference
In-Depth Information
Energy cost scenario
1
Node 4
Node 3
Node 2
0.5
0
−0.5
−1
2
4
6
8
10
12
14
16
18
20
22
24
Time (h)
Figure 6.21
Dispatch of thermal storage units for case study 6
Composite scenario
1.2
Node 4
Node 3
Node 2
0.8
0.4
0
−0.4
−0.8
−1.2
2
4
6
8
10
12
14
16
18
20
22
24
Time (h)
Figure 6.22
Dispatch of thermal storage units for case study 7
operating parameters such as load factor and peak load. In general terms, if properly
coordinated, micro-CHP and PHEV devices have the potential to provide an area of
opportunity to enhance the operation of electrical networks. Consequently and anal-
ogous to the results detailed for natural gas networks, Tables 6.12 and 6.13 describe
 