an “arms-length” and sometimes adversarial relationship between the designer and
the builder and put ultimate responsibility for the project with the owner.
•Value-basedselection. In a DBB project, the builder is typically selected solely on
the basis of price. In DB, the owner can specify a range of criteria in addition to low
price when awarding the contract. Selection factors include the design-builder's
experience with similar projects, innovative ideas for meeting project objectives,
and ability and willingness to work as a team with the owner's staff.
Other
17%
Water
41%
Conveyance
6%
Wastewater
36%
Figure 3-3. Percentage of surveyed project types for water versus wastewater infra-
structure for 2005-2010
Source: Water Design-Build Council Proprietary Contract Database.
>$50M
8%
<$500k
16%
$10M-$50M
17%
$500k-$1M
20%
$5-10M
14%
$1M-$5M
25%
Figure 3-4. Percentage of projects by sales value for 2005-2010