rate-of-change-of-
Frequency
setting. The
TSO
shall, within a reasonable period and in any case
within no more than 28 days, discuss with the
Gen-
erator
whether the proposed settings are satisfactory.
The agreed settings shall be specified in the
Con-
nection Agreement
or other agreement.
(ii)
In relation to any
Generator
which has agreed the
settings with the
TSO
under these provisions, the
TSO
shall notify that
Generator
of any change of which it
is aware in the expected rate-of-change-of-
Frequency
on the
System
which may require new settings to be
agreed.
CC.S2.9.3
Each
Generator
shall be responsible for protecting the
WFPSs
owned or operated by it against the risk of damage which might
result from any
Frequency
excursion outside the range 52-47.5 Hz
and for deciding whether or not to interrupt the
Connection
between its
Plant
and/or
Apparatus
and the
Transmission System
in the event of such a
Frequency
excursion.
CC.S2.10
Additional Information
CC.S2.10.1
Each
Generator
shall provide the calculated
Output
for the
WFPS
as part of the application for
Connection
of that
WFPS
to
the
Transmission System
. This will take the form of a diagram
showing wind speed and direction against electrical output in
MW
,in
Wind Rose
format. Following
Connection
, the
WFPS
shall be
Monitored
for a period to confirm the validity of the
calculations, which may be used for future
Output
predictions.
This
Monitoring
shall be completed before a final compliance
certificate is issued. Each
Generator
requires a temporary com-
pliance certificate issued by the
TSO
in respect of each of its
WFPSs
before being allowed to operate it.
CC.S2.10.2
A temporary compliance certificate may be issued to allow tests
or
Monitoring
that can only be performed on energised and/or
loaded
Plant
. After a period of time not exceeding one year from
the date on which a temporary compliance certificate takes effect
(unless the
TSO
in its absolute discretion agrees to extend the
validity of a temporary compliance certificate), the
TSO
shall
issue a final compliance certificate or indicate the reason why a
final compliance certificate cannot be issued. The final com-
pliance certificate may be issued with or without conditions
depending upon the result of compliance tests. A temporary or