Environmental Engineering Reference
In-Depth Information
CC.S2.8
Neutral Earthing
CC.S2.8.1
The winding configuration and method of
Earthing
of
WFPSs
and associated
Generator Transformers
shall be agreed with the
TSO
or, if agreement cannot be reached, determined by the
TSO
.
The principles applying are as set out in
CC
6.8.
CC.S2.9
Automatic Shedding Devices
CC.S2.9.1
Load Shedding
external to the
WFPS
There is an expectation that
WFPSs
will continue to operate
outside statutory
Frequency
limits. The
WFPS
could be
Con-
nected
within an
Automatic Load Shedding
zone as detailed in
OC
4. Consequently,
Users
shall ensure that
Protection
on
WFPSs
shall have settings to co-ordinate with the settings on the
Automatic Load Shedding
equipment as detailed by the
TSO
on
request by the
User
.
CC.S2.9.2
Frequency
Tolerance and
Frequency
Shedding of the
WFPS
(a)
Each
WFPS
shall be capable of satisfactory operation at any
Frequency
within the range of 47.0-51.5 Hz for the mini-
mum time periods specified below unless the
TSO
has
agreed to the use of any
Frequency
level relays which will
trip the
WFPS
within this
Frequency
range.
Minimum time periods:
Below Nominal
Frequency (Hz)
Above Nominal
Frequency (Hz)
Operation
Requirement
49.5-50.0
50.0-50.5
Continuous
48.4-49.5
50.5-51.5
For a period of 60 minutes
47.5-48.4
-
For a period of 30 seconds
(b)
Where
WFPSs
are equipped with rate-of-change-of-frequency
relays or other devices which measure and operate in rela-
tion to a rate-of-change-of-frequency (e.g. a governor) the
procedure in
CC
.S2.9.2(c) below will be followed to ensure
satisfactory operation of the
WFPSs
.
(c)
The procedure:
(i)
At a reasonable time prior to a
WFPS
being
Connected
to the
Transmission System
, and prior
to any relevant modification to a
WFPS
or any
relevant
Power Station Equipment
,the
Generator
shall contact the
TSO
with details of the proposed