Figure 23.19 Splitting a schedule
A schedule can be split multiple times if necessary. The dot grip at the
bottom of the first section of the schedule can be dragged up or down to
control at which row the split occurs. To put a split schedule back together,
click and drag one of the blue arrow grips that appears in the center of a
section onto another section of the schedule.
Schedules can be snapped to guide grid lines on a sheet by using the Move
tool and snapping to the outline graphics of the schedule as the starting
point. This can be useful for schedules that appear on multiple sheets, such
as a Room schedule.
Using Sheet Lists
A sheet list is a special kind of schedule that can be used to display project
sheet information on a title sheet or anywhere within your project. You
create sheet lists in the same way as other schedules, and the parameters
that are available apply to sheet views. You can also use a sheet list to keep
track of the information that is required on your sheets.
When you begin a project, you can create a sheet list and input projected
sheets to estimate the contents of your construction document set. This is
 