Graphics Programs Reference
In-Depth Information
or included in your project template. Another option is to put the notes in
a legend view, which allows you to place the same notes on more than one
sheet.
Views on Multiple Sheets
Plan, section, and elevation views can be placed on only one sheet. This
is also true for drafting and detail views. Schedules and legend views
can be placed on multiple sheets.
Placing Schedules
Schedules are placed on sheets in the same way as views, by dragging and
dropping them from the Project Browser. When you place a schedule onto
a sheet, it may not look the same as it does when the schedule view is open
in the drawing area. The columns of a schedule can be resized on a sheet by
using the triangular grips that appear at the top of each column-separation
line. The height of each row adjusts to accommodate the amount of text
withinacellwhenthecolumnwidthismodified.Thesmallgripthatappears
at the right side of a schedule allows you to split the schedule if it is too
long to fit on a sheet. Figure 23.19 shows that when you split a schedule, the
headings are applied to each section.
 
Search WWH ::




Custom Search