Figure12.6 Schedule Properties dialog box
5. On the left side of the dialog box, select the parameter that you created
as the target lighting level for your spaces and click the Add button to
include it in the schedule. These are the only two fields required for this
schedule, and there is no need to format them or adjust the appearance
of the schedule because it is used only for analysis.
6. Click OK to create the schedule.
7. The schedule does not contain any data rows. At this point, you need to
build your key for lighting requirements. Click the Insert button on the
Rows panel of the Modify Schedule/Quantities tab and select the Data
Row option to create a row in your schedule.
8. Change the name of the key in the schedule to that of a common type of
building space.
9. Add the appropriate lighting level for that type of space in the second
column of the schedule, as shown in Figure 12.7 .
Figure 12.7 Schedule key data input
10. Repeat the process of adding rows, creating space types, and assigning
lighting levels until your schedule contains all the space types you
 
 
 