Graphics Reference
In-Depth Information
Figure 18-25. A machine screw will be used to trigger the final endstop.
Drill two pilot holes and use #4-5/8” wood screws to secure the endstop, as shown in Figure 18-26.
Add another #6-32 nut to the end of the #6 machine screw and turn it on the machine screw until it is in
place where it will push against the endstop's pushbutton when the lead screw has reached its
maximum height (flush with Part N.) (You can secure the nut in place with a hot glue gun or simply use
a piece of duct tape to prevent it from turning on the machine screw.)
Search WWH ::




Custom Search