Graphics Reference
In-Depth Information
Figure 11-1 shows Part H with the two of the #8 bolts inserted through the Strong-Tie and into the
plywood piece.
Figure 11-1. Part H with two #8 bolts holding a Strong-Tie in place
Finger-tighten two #8 nuts onto the #8 bolts through the Strong-Tie and into the plywood. Attach
the second Strong-Tie to Part H using two additional #8 bolts (1” length). Figure 11-2 shows the two
Strong-Tie rails attached.
Search WWH ::




Custom Search