Critical row of bolts
50 cm
3
8.5 cm
174 cm
y
y
170 cm
33
3
70
Figure 4.122 The field splice of the main plate girder.
diameter plus 0.3 cm clearance), we can determine the horizontal shear force
( H ) per bolt and the vertical shear per bolt ( V ) as follows:
H ¼ Area from centrelines between bolts f y
F y ¼ 275MPa
H ¼ 85 30
ð
Þ 16 275
=
2 ¼ 121,000N ¼ 121 kN
maximum shear resisted by web/total number of bolts.
Maximum shear resisted by web:
1
:
2 275 1740 16
V b , Rd ¼V bw , Rd
p 1
¼ 5,304,232N ¼ 5304
:
2kN
:
1
V ¼ 5304 : 2 = 40 ¼ 132 : 6kN
The
resultant
of
the
forces
per
bolt
( R )
is
equal
to
p
121 2 + 132
6 2
5 kN, which is less than 206 kN (the resistance of
the bolt in double shear). Then O.K.
:
¼ 179
:
 
 
 