Civil Engineering Reference
In-Depth Information
Table 19.3 (continued)
Project
HOV operations before conversion
HOV operations after conversion
SR-167 Hot lanes
Seattle, WA
￿
2+ HOVs and motorcycles allowed access
￿
No capacity added
conversion required operational changes
￿
11 miles single-lane directional facility
only
￿
￿
Only two adjacent general-purpose lanes in each
direction
￿
No occupancy requirement changes
￿
HOVs not required to carry transponders
Unlimited access locations to HOV lane
￿
Free motorcycle access continued
￿
Limited transit service
￿
SOVs and hybrids pay toll for access
￿
Access to HOT lane at designated locations only
￿
No trucks allowed
I-15 Express lanes
Salt lake city, UT
￿
2+ HOV, hybrids with decals
￿
Started with decal program to registered SOVs willing to pay
$50/month for unlimited use, transitioning to toll for SOVs with
transponders
￿
￿
and motorcycles allowed access
￿
Single directional lanes in both directions
￿
Unlimited access
No capacity added
conversion required operational changes
￿
Limited transit service
only
￿
No occupancy requirement changes
￿
All HOVs and hybrids are not required to carry transponders
￿
Free motorcycle access continued
￿
SOVs pay toll for access
￿
No trucks allowed
￿
No transit service changes
Source Reference [ 6 ], P 68. Table 4.1
Search WWH ::




Custom Search