Table 7.1 (continued)
Sr. No.
Item specifications
Unit of work
Required man-days
Unskilled
Semi-skilled
Skilled
(ii) DT-2
100 m
54
2
(e) More than 50 % stones have to be quarried, using wedges, jumpers, etc., and the dyke is
of standard section:
(i) DT-1
100 m
52
2
(ii) DT-2
100 m
72
2
4-5
Construction of bench terraces 5 m wide with riser batter 1:1, on contour on steep hilly slopes,
including cutting, dressing, filling, compacting, and lining the riser with dry-stone pitching
30 cm thick, where:
(a) Terrain slope is 15 %, and the soil is of hardness class:
(i) S4
100 m
67
(ii) S5
100 m
100
(b) Terrain slope is 20 %, and the soil is of hardness class:
(i) S4
100 m
100
(ii) S5
100 m
150
(c) Terrain slope is 25 %, and the soil is of hardness class:
(i) S4
100 m
130
(ii) S5
100 m
195
4-6
Construction of gradoni on contour lines marked on sloping hilly ground, including cutting
and filling of soil to from a bench of 1.2 m width with an inward slope of 20 %, where
(a) Terrain slope is 10 %, and soil is of hardness class:
(i) S3
1,000 m
18
(ii) S4
1,000 m
24
(iii) S5
1,000 m
36
(b) Terrain slope is 15 %, and soil is of hardness class:
(i) S3
1,000 m
27
(ii) S4
1,000 m
36
(iii) S5
1,000 m
54
(c) Terrain slope is 20 %, and soil of hardness class:
(i) S3
 