Agriculture Reference
In-Depth Information
Table 7.1 (continued)
Sr. No.
Item specifications
Unit of work
Required man-days
Unskilled
Semi-skilled
Skilled
(i) S1
100 m
65
(ii) S2
100 m
72
(iii) S3
100 m
81
(iv) S4
100 m
108
(v) S5
100 m
162
(vi) S6
100 m
324
(vii) S7
100 m
648
3-7
Repair including re-digging of ditch-cum-bund fence which has been partly or wholly filled
with soil from outside or from collapsing of its own section or bund, in soils of hardness
class:
(a) S1, S2, or S3
100 m 3
40
100 m 3
(b) S4 or S5
50
100 m 3
(c) S6 or S7
65
3-8
Loading or unloading of cement bags, polypot bags, barbed wire rolls, angle-iron posts, etc.
onto animal carts like bullock- or camel-driven carts
100 t
8
3-9
Transportation of cement-bags, bags of polypots, barbed wire rolls, angle-iron posts, or other
such materials using animal-driven carts, excluding loading and unloading, over a mean
distance of:
(a) 2 km
100 t
35
(b) 5 km
100 t
74
(c) 10 km
100 t
138
(Note: For a more comprehensive treatment of cost of transportation please see Table 22-5)
3-10
Casting of cement concrete blocks with embedded angle-iron posts, in 1:2:4 or similar mix,
using moulds of prescribed size, including curing in water for 7 days, where blocks are of
size:
(a) CCB-1 (t: 0.15, b: 0.25, h: 0.35, v: 0.014 m 3 )
100 nos.
10
(b) CCB-2 (t: 0.20, b: 0.30, h: 0.45, v: 0.281 m 3 )
100 nos.
18
3-11
Casting of reinforced cement concrete fence posts of standard size, in 1:2:4 or similar concrete
mix, using moulds of prescribed size, including curing in water for 7 days:
 
Search WWH ::




Custom Search