Civil Engineering Reference
In-Depth Information
Legend:
None
Slight
Modetate
Extensive
Complete
(a)
Legend:
<- 0.05
<- 0.15
<- 0.25
<- 0.35
<- 0.45
<- 0.55
<- 0.65
<- 0.75
<- 0.85
<- 0.95
<- 1.00
(b)
11.15 Graphical output of the software implementing the MCEER
methodology (© 2011 Google).
(CSS); and (iii) maximum of three construction sites per day inside the
selected area (CS).
Figure 11.18a is a 3D histogram, plotted on Google Earth, of the discrete
probabilities of damage states for buildings and road network (no damage
in black, collapse in white). Figure 11.17b shows the functionality in all
buildings and in the entire road network immediately after the disaster.
Search WWH ::




Custom Search