Civil Engineering Reference
In-Depth Information
Designing
beam group
Role:
Player
Choosing
beam
sizes
Process owner:
/designer
John Smith
Initiating the
process
Reporting
the result
Checking
the sizes
Analyst:
Sally Jones
Role:
Player
Role:
Player
Initiating the
process
Choosing a
detailer
Reporting
the result
Initiating the
process
Choosing a
method
Reporting
the result
Process owner:
John
Smith
Process owner:
Sally
Jones
Sizing the
beams
Doing the
calculations
Engineer:
Fred
Blythe
Analyst:
Sally
Jones
9.8 Dome detailed design processes.
 
Search WWH ::




Custom Search