After an initial installation of the first OMS, the agents and users connect via the physical hostname:
$ $OMS_HOME/bin/emctl status oms -details
Oracle Enterprise Manager Cloud Control 12c Release 2 Copyright (c) 1996, 2012 Oracle
Corporation. All rights reserved.
Enter Enterprise Manager Root (SYSMAN) Password :
Console Server Host : oem1.example.com
HTTP Console Port : 7790
HTTPS Console Port : 7803
HTTP Upload Port : 4890
HTTPS Upload Port : 4904
EM Instance Home : /u01/app/oracle/Middleware/gc_inst/em/EMGC_OMS1
OMS Log Directory Location : /u01/app/oracle/Middleware/gc_inst/em/EMGC_OMS1/sysman/log
OMS is not configured with SLB or virtual hostname
Agent Upload is locked.
OMS Console is locked.
Active CA ID: 1
Console URL: https://oem1.example.com:443/em
Upload URL: https://oem1.example.com:4904/empbs/upload
WLS Domain Information
Domain Name : GCDomain
Admin Server Host: oem1.example.com
Managed Server Information
Managed Server Instance Name: EMGC_OMS1
Managed Server Instance Host: oem1.example.com
WebTier is Up
Oracle Management Server is Up
When a Server Load Balancer is configured, agent and console traffic is directed to multiple management
services by the SLB. The SLB configuration should be done after the installation of the first OMS.
Server Load Balancer Configuration
The configuration of the SLB may vary depending on the manufacturer of the device. However, there are several
requirements for the SLB, which are listed here:
Virtual server ports : Four ports should be configured—Secure Upload, Agent Registration,
Secure Console and Unsecure Console. If the OMS is configured for only secure upload
and agent traffic, then only the Secure Upload and Secure Console virtual server ports are
required.
 