TABLE 3
The CVA must . . .
Operation or equipment to be inspected . . .
(1) Verify, as appropriate
(i) Loadout and initial flotation operations;
(ii) Towing operations to the specified location, and review
the towing records;
(iii) Launching and uprighting operations;
(iv) Submergence operations;
(v) Pile or anchor installations;
(vi) Installation of mooring and tethering systems;
(vii) Final deck and component installations; and
(viii) Installation at the approved location according to the
approved design and the installation plan.
(i) The loadout of the jacket, decks, piles, or structures from
each fabrication site;
(ii) The actual installation of the platform or major modifica-
tion and the related installation activities;
(i) The loadout of the platform;
(ii) The installation of drilling, production, and pipeline ris-
ers, and riser tensioning systems (at least for the initial
installation of these elements);
(iii) The installation of turrets and turret-and-hull interfaces;
(iv) The installation of foundation pilings and templates, and
anchoring systems; and
(v) The installation of the mooring and tethering systems.
Survey the platform after transportation to the approved
location.
(i) Equipment;
(ii) Procedures; and
(iii) Recordkeeping.
(2) Witness (for a fixed or floating
platform)
(3) Witness (for a floating platform)
(4) Conduct an onsite survey
(5) Spot-check as necessary to
determine compliance with the
applicable documents listed in
§250.901(a); the alternative codes,
rules and standards approved
under §250.901(b); the
requirements listed in §250.903
and §250.906 through
250.908 of this subpart and
the approved plans.