the approved schedule required by §250.911(d). In each interim and
final report the CVA must
1. Give details of how, by whom, and when the independent moni-
toring activities were conducted;
2. Describe the CVA's activities during the verification process;
3. Summarize the CVA's findings;
4. Confirm or deny compliance with the design specifications and the
approved fabrication plan;
5. In the final CVA report, make a recommendation to accept or
reject the fabrication unless such a recommendation has been pre-
viously made in an interim report; and
6. Provide any additional comments that the CVA deems necessary.
[70 FR 41575, July 19, 2005, as amended at 73 FR 64547, Oct. 30, 2008.]
§ 250.918 What are the CVA's primary duties during the installation
phase?
a. The CVA must use good engineering judgment and practices in con-
ducting an independent assessment of the installation activities.
b. Primary duties of the CVA during the installation phase include the
following: [Table 3].
c. The CVA must submit interim reports and a final report to the Regional
Supervisor, and to you, during the installation phase in accordance with
the approved schedule required by §250.911(d). In each interim and
final report the CVA must
1. Give details of how, by whom, and when the independent moni-
toring activities were conducted;
2. Describe the CVA's activities during the verification process;
3. Summarize the CVA's findings;
4. Confirm or deny compliance with the approved installation plan;
5. In the final CVA report, make a recommendation to accept or reject
the installation unless such a recommendation has been previously
made in an interim report; and
6. Provide any additional comments that the CVA deems necessary.
[70 FR 41575, July 19, 2005, as amended at 73 FR 64547, Oct. 30, 2008.]