R =0
:
CS
is a set of unfinished jobs of which
ENR
are minimum (
CS = S
i
). This
method selects a job that has a minimum
EC
J
in minimum
ENR
jobs.
-
R = inf
:
CS
is a set of all unfinished jobs (
CS = S
i
+ S
i+1
+ ...
). This method selects
a job that has a minimum
EC
J
in all unfinished jobs.
The parameters and assumptions in Sec. 3.2. are also used in simulations here.
4.3.2.
Simulation Results
270
0.02
rr1
random
ENR
ECJ(R=inf)
ECJ(R=0)
ε
acc
r
r
1
random
ENR
ECJ(R=inf)
ECJ(R=0)
260
250
0.015
240
230
0.01
220
210
0.005
200
190
0
180
0
0.2
0.4
0.6
0.8
1
0
0.2
0.4
0.6
0.8
1
s
s
(a) Error-rate
(b) Computation time
T
Figure 23. Error rate and Computation time for sabotage rate
s
(
acc
=0.01
,
f =0.35
,
c =0.0
,
q =0.1
,
p
d
=0
, with blacklisting)
0.02
260
rr1
random
ENR
ECJ(R=inf)
ECJ(R=0)
ε
acc
rr1
random
ENR
ECJ(R=inf)
ECJ(R=0)
250
0.015
240
230
0.01
220
210
0.005
200
190
0
180
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35
0
0.05 0.1 0.15 0.2 0.25 0.3 0.35
f
f
(a) Error-rate
(b) Computation time
T
Figure 24. Error rate and Computation time for fraction
f
(
acc
=0.01
,
s =0.1
,
c =0.0
,
q =0.1
,
p
d
=0
, with blacklisting)