as a holiday. In addition, enter two rain days per month. Try to distribute
these rain days as evenly as possible.
9. The general contractor (GC) will be doing mainly the structural work, using
his or her own workforce, but the GC will use the following subcontractors
for other work:
Nickname
Full Name
Type of work
HVAC a
ACAL
All Seasons AC & Heating
WALL
Wall to Wall
Drywall, Stucco, and Paint
MART
Master Art Landscape
Site Work and Landscaping
MASE
Mase & Company
Masonry
ROSS
Ross Carpentry & Framing
Wood Framing
PLMX
Plumbing Experts
Plumbing
RABT
Rabbit-the-Roofer
Roofing
TACO
Tile and Carpet Co., Inc.
Flooring
WINT
Windows & Doors NT
Doors and Windows
ZAPP
Zapp Electric Co.
Electrical
a Heating, ventilation, and air-conditioning.
10. Four areas are designated in the project: ALL (for all of the project), 1st (for
first-floor activities), 2nd (for second-floor activities), and ROOF (for roof
activities).
Duration (days) IPA a
Rel. Type b Lag (days) i
Resp. c
Activity ID Activity Title
Area
NTP d
1000
——
GC
ALL
1010
Mobilization
3
1000
GC
ALL
1020
Clear & grub
12
1010
GC
ALL
1030
Excavation
7
1020
SS
4
GC
ALL
1040
Foundation
15
1030
SS
3
GC
ALL
1030
FF
1
1050
Fill, compact, and treat soil
3
1040
GC
ALL
1060
1st floor plumbing rough-in
3
1050
PLMX 1st
1070
SOG
4
1060
GC
1st
1080
1st floor columns
7
1050
GC
1st
1090
1st floor external CMU walls
10
1070
MASE 1st
1100
1st floor internal CMU walls
14
1070
MASE 1st
1110
2nd floor suspended slab
8
1080,
1090,
1100
GC
2nd
1120
2nd floor plumbing rough-in
3
1110
SS
1
PLMX 2nd
1 e
1110
FF
1130
1st floor electrical rough-in
4
1090,
1100,
1280
SS
2
ZAPP
1st
1090,
1100,
1280
FF
2
 