Civil Engineering Reference
In-Depth Information
Figure 15.25 Snapshot of the 4D model of the building, Example 3
Figure 15.26 Snapshot of the 4D model of the building, Example 4
function automatically adjusts the width and length values in terms of a ratio of 2:1
for width:height. The image can also be exported based on the size of the active
model in Navisworks by selecting the Use View option.
Navisworks also offers the ability to create and export a 4D AVI movie of the
model as an external file. The format of the output should be selected as Windows
AVI when creating an external 4D movie file. The size of the animation also should
be determined, which will identify the output resolution of the AVI file. The number
Search WWH ::
Custom Search