Civil Engineering Reference
In-Depth Information
Figure 15.23 Snapshot of the 4D model of the building, Example 1
Figure 15.24 Snapshot of the 4D model of the building, Example 2
managed with the “Animation Export” interface, as shown in Figure 15.31. The set-
tings such as “Renderer,” “Output Format,” “Size Type,” “Anti-aliasing,” and “FPS”
should be defined by Navisworks users.
When snapshots are being created, the image formats should be selected in
terms of .jpg, .bmp, or .tif formats, and the size of the images should be defined.
There are three different size types for the images that will be exported: Explicit, Use
Aspect Ratio, and Use View. Explicit is for the custom-selected sizes; that is, users
should enter the width and height information for the image. “Use Aspect Ratio”