Civil Engineering Reference
In-Depth Information
9. What is the risk of using PERT and focusing on the critical path only?
10. What types of projects are best for the PERT application?
11. Is PERT popular in the construction industry? Why?
12. What is the main difference between PERT and GERT?
13. What types of projects are best for the LSM application?
14. What are the steps for preparing an LSM schedule?
15. Define time buffer and distance buffer . Use words and graphs to explain your
answer.
16. Draw an LSM schedule for a 5-mile stretch of a road project. Consider the fol-
lowing activities:
Activity
Daily production (LF)
A. Excavation
500
B. Subbase
300
C. Base
240
D. Paving
1,000
E. Striping and Signage
1,500
17. Draw an LSM schedule for a 2-mile road-resurfacing project. Consider the fol-
lowing activities:
Activity
Daily production (LF)
A. Milling
2,000
B. Structural Course
1,000
C. Friction Course
800
D. Striping and Signage
1,200
 
Search WWH ::




Custom Search