1.
The probability that the project will finish by the end of day 32
.Using
equation 11.7, we find that
Z
=(
32
−
32
)∕
2
.
972
=
0. From the
Z
table
(Table 11.1), we find that
Pr
(
T
s
≤
32
)=
0
.
5
=
50
%
See Figure 11.2.
Figure 11.2 Solution to example 11.1, part 1
2.
The probability that the project will finish by the end of day 34
.
Z
=(
34
−
32
)∕
2
.
972
=
0
.
67
From Table 11.1, we find that
Pr
(
T
s
≤
34
)=
0
.
749
=
74
.
9
%
See Figure 11.3.
Figure 11.3 Solution to example 11.1, part 2