Figure 13.40 Prior probability that fraction of contaminated soil is less than 0.05 in subareas of oil refinery.
Cost
Remediation
C R
Use available data
No future problem
$ 0
No
remediation
P ( H £ 1/20) = p i
C R : $ Cost of
remediation
Future problem
3 × C R
P ( H > 1/20) = 1- p i
Subarea i :
H ~ Beta(a′ i , b′ i )
P ( H < 1/20) = p i
X : Number of
contaminated samples
Remediation
X = 0
C R
Initiate
sampling
program
X = x
No future problem
$ 0
H | X = x ~ Beta(a′′ i , x , b′′ i , x )
P ( H <1/20| X = x ) = p ′′ i , x
No
remediation
n samples
P ( H £ 1/20| X = x ) = p i
X = n
Future problem
3 × C R
P ( H > 1/20| X = x ) = 1- p i
Figure 13.41 Preposterior decistion tree to assess value of information in obtaining additional soil samples
from a subarea of oil refinery.
 