Table 1.8 Guideline to extent of investigation.
Development
Test spacing
Approximate depth of investigation
Building
20 m to 50 m
2B-4B for shallow footings
(Pads and Strip, respectively)
3 m or 3 pile diameters
below the expected founding
level for piles. If rock
intersected ensure -
N >
100 and RQD
>
25%
1.5B (building width) for rafts or closely
spaced shallow footings
1.5B below 2/3D (pile depth) for pile rafts
Bridges
At each pier location
4B-5B for shallow footings
10 pile diameters in competent
strata, or
Consideration of the following if
bedrock intersected
- 3 m minimum rock coring
- 3 Pile diameters below target
founding level based on
N >
150
RQD
50%
Moderately weathered or better
Medium strength or better
>
Embankments
25 m to 50 m (critical areas)
Beyond base of compressible
100 m to 500 m as in roads
alluvium at critical loaded/suspect
areas, otherwise as in roads.
Cut Slopes
25 m to 50 m for H
5 m
5 m below toe of slope or
>
50 m to 100 m for H
5 m
3 m into bedrock below toe
whichever is shallower.
<
Landslip
3 BHs or test pits
Below slide zone. As a guide (as the
minimum along critical
slide zone may not be known) use 2
×
section
height of slope or width of zone
of movement. 5 m below toe of slope
or 3 m into bedrock below toe
whichever is shallower.
Pavements/roads
250 m to 500 m
2 m below formation level.
Local roads
150 m
2 to 3 locations
<
Local roads
150 m
50 m to 100 m
(3 minimum)
>
Runways
250 m to 500 m
3 m below formation level.
Pipelines
250 m to 500 m
1 m below invert level.
Tunnels
25 m to 50 m
3 m below invert level or 1 tunnel
diameter, whichever is deeper: greater
depths where contiguous piles for retentions.
Deep tunnels need
Target 0.5-1.5 linear m drilling per route
special consideration
metre of alignment.
Lower figure over water or difficult
to access urban areas.
( Continued )
 