Geoscience Reference
In-Depth Information
Other measures may also be used as shown in the Table.
Table 17.15 Earthworks control measures.
Method
Measurement
Typical value
Comment
Relative
Insitu density and
Trenches : RC 90%
This can be an
Compaction (RC)
maximum dry density
Subgrade RC
95%
expensive process
>
Pavements RC
>
98%
due to the large
number of tests
required
Method
Equipment
Lift
250 mm
Useful in rocky
+
specification
thickness
No. of
5 No. passes
material
+
passes
Degree Of
Density, Moisture
Base DOS
70%
Near OMC
<
Saturation (DOS)
content and specific
Sub - base DOS
<
80%
gravity
Subgrade DOS
95%
Modulus
Direct eg plate load test
Base E
400 MPa
Useful in rocky
>
Sub - base E
>
200 MPa
material
Rocky subgrade
E
>
100 MPa
17.16 Typical compaction requirements
The minimum compaction requirements depends on the type of layer, thickness,
operating area, proximity to services/structures and equipment used.
Table 17.16 Typical compaction requirements.
Type of
Element
% Standard
Placement moisture
construction
compaction
content
Roads and
Heavily loaded pavement
Base
100%
Dry of OMC,
>
rail
DOS
70%
<
Lightly loaded pavement
Subbase
98 %
Dry of OMC,
DOS
>
80%
<
Subgrade
WPI
<
2200
>
95%
OMC
General embankment fill
WPI
2200
90%
OMC
<
>
Subgrade
WPI
2200,
92% to 98%
EMC
>
General embankment fill
3m
but
3200
90% to 96%
EMC
<
General embankment fill
3m
90%
OMC
>
>
Subgrade
WPI
>
3200
92% to 98%
EMC
General embankment fill
5m WPI
3200
90% to 96%
EMC
>
General embankment fill
5m WPI
3200
90%
OMC
>
>
>
Structure
Subgrade
WPI
<
2200
>
98%
EMC
General fill
WPI
<
3200
92% to 98%
EMC to OMC
Walls
Backfill, in trenches
90% to 95%
OMC to dry of OMC
Dams
Small
94% to 100%
OMC to wet of OMC
Large
97%
OMC to wet of OMC
>
Landfills
Capping
88% to 94%
EMC
Liners
94% to 100%
OMC to wet of OMC
Canals
Clay
90% to 95%
OMC to wet of OMC
 
 
Search WWH ::