Pore water pressure u 2 measured at shoulder of 10 cm 2 piezocones.
Multiply by 1.5 for 15 cm 2 piezocones.
Soil mixtures would have intermediates times.
Figure 8.2 Drainage paths.
8.16 Time factors for consolidation
T v d 2 /c v .
The time to achieve a given degree of consolidation
=
t
=
Time Factor
=
T v .
D
=
maximum length of the drainage path
=
½ layer thickness for drainage top
and bottom.
Degree of Consolidation
=
U
=
Consolidation settlement at a given time (t)/Final
consolidation settlement.
α =
u 0 (top)/u 0 (bottom), where u 0
=
initial excess pore pressure.
Table 8.16 Time factor values (from NAVFAC DM 7-1, 1982).
Degree of
Time factor T v
consolidation
1.0
0
α =
α =
α =∞
(two way drainage)
(one way drainage -
(one way drainage -
bottom only)
top only)
10%
0.008
0.047
0.003
20%
0.031
0.100
0.009
30%
0.071
0.158
0.024
40%
0.126
0.221
0.048
50%
0.197
0.294
0.092
60%
0.287
0.383
0.160
70%
0.403
0.500
0.271
80%
0.567
0.665
0.440
90%
0.848
0.940
0.720
 
 