Figure 6 Continued.
The ground surface was lifted 10 to 20 cm in tests 2 and 3. In tests 4 and 5,
where soil cement was used, the ground surface settled for over 20 cm. In
test 5, where the soil cement was installed below the springline, the surface
settled very slowly. Thus the flowing-in of
the surrounding sand was
prohibited.