Geoscience Reference
In-Depth Information
W
E
a)
b)
SH20
North loop
Gossan
Zone 3
mineralisation
Zone 1
mineralisation
(projected)
Current
filament
West loop
Central loop
SH20
Cross-
section
Zone 4
mineralisation
(projected)
Current
filament
Grid
0
50
Metres
0
100
South loop
Metres
c)
Response (nT/s)
Response (nT/s)
Response (nT/s)
Response (nT/s)
Response (nT/s)
-100
0
+1 0 0
-100
0
+1 0 0
-100
0
+1 0 0
-100
0
+1 0 0
-100
0
+1 0 0
0
100
200
Western
loop
Central
loop
Eastern
loop
Southern
loop
Northern
loop
300
d)
Response (nT/s)
Response (nT/s)
Response (nT/s)
-100
0
+100
-100
0
+100
-100
0
+100
0
Central
Loop
100
200
A component
U component
V component
300
Figure 5.95 DHEM data from Balcooma massive sulphide. (a) Geological cross-section, (b) location of the
five transmitter loops around
drillhole SH20, (c) axial component late-time data from the
five transmitter loops, (d) three-component late-time data from the central
transmitter loop. All loops are 200 m
200 m in size. Based on diagrams in Hughes and Ravenhurst ( 1996 ).
 
Search WWH ::




Custom Search