Geoscience Reference
In-Depth Information
Primary Treatment
Secondary Treatment
Influent
Air
Chlorine
Euent
Primary
Settling
Collection
System
Screening &
Comminution
Grit
Chamber
Secondary
Settling
Chlorine
Contact Tank
Aeration
Activated Sludge
Screenings
Grit
Anaerobic
Digester
Sludge
Dewatering
ickener
Sludge
Disposal
FIGURE 24.1 Illustration of a wastewater treatment process providing primary and secondary treatment
using activated sludge process.
3
Screenings (ft
)
3
Screenings removed (ft /MG)
=
(24.2)
Flow (MG)
EXAMPLE 24.1
Problem: A total of 65 gal of screenings is removed from the wastewater flow during a 24-hr period.
What is the screenings removal reported as ft 3 /day?
Solution: First convert gallon screenings to cubic feet:
(65 gal)/(7.48 gal/ft 3 ) = 8.7 ft 3 screenings
Then calculate screenings removed as ft 3 /day:
3
8.7 ft
1day
3
3
Screenings removed (ft /day)
=
= .. 7ft/day
8
EXAMPLE 24.2
Problem: During 1 week, a total of 310 gal of screenings was removed from the wastewater screens.
What is the average screenings removal in ft 3 /day?
Solution: First convert gallon screenings to cubic feet:
(310 gal) ÷ (7.48 gal/ft 3 ) = 41.4 ft 3 screenings
Then calculate screenings removed as ft 3 /day:
3
41.4 ft
7days
3
3
Screenings removed (ft /day)
=
= 5.9 ft /day
 