Geoscience Reference
In-Depth Information
users can search on archetype or via a map on location. Afterwards queries can be
refined. Predictions can be made on the same website.
Installation sheet piling
Installation sheet piling
Installation sheet piling
Facts
Sounding
Producer
Type piling
Combination
Equipment
Facts
Sounding
Producer
Type piling
Combination
Equipment
Facts
Sounding
Producer
Type piling
Combination
Equipment
hs14
hs14
browser
browser
select
select
hs14
browser
select
Arbed
AZ26
Double
Vibrator
Arbed
AZ26
Double
Vibrator
Arbed
AZ26
Double
Vibrator
Length
Type
Length
Type
Length
Type
32
PVE 50m
32
PVE 50m
32
PVE 50m
Start Prediction
Start Prediction
Start Prediction
Sounding
Sounding
Prediction
low
high
There is a high risk that the sheet piling will not reach depth.
Recommended mitigation measures to reduce risk
Pre-drilling
Pull-down
Water jetting
Fluidization
Reduce lock friction
Post-driving
Figure 8.13 Result of a prediction using GeoBrain Foundations (installation sheet piling)
An example of the use is shown in Fig 8.13, for sheetpile installation in
GeoBrain Foundations, created by Hemmen and Bles 39 . The input is a soil profile
and CPT, and the choice of equipment and material. The system will then provide a
prediction of the risk of malfunction, based on the probabilities in the experience
database, shown by a bolt in a strip running from high to low risk. The system will
also provide mitigation measures to improve the approach. Here, six potential
measures are listed: predrilling, pull-down, water jetting, fluidization, reducing
lock friction, or post-driving, each with their risk effect shown in a horizontal bar.
This information is important for the user to estimate risk and cost, and make a
final decision how to execute the work.
The use of Geobrain is restricted to members. GeoBrain Foundations proves that
sharing experience is beneficial: unnecessary risks are avoided in a systematic
manner.
39 GeoBrain Foundations was supported by the Dutch Association for Contractors in
Foundation Engineering (NVAF), ProRail, CROW, Allianz, Cunningham and Lindsey,
AON and Clark Risk Management, the Ministry of Transport, Public Works and Water
Management, Municipality of Rotterdam, BAM Civil Techniques, CFE, Ballast Nedam
Foundation Techniques, Terracon Foundation Techniques, Voorbij, MUC and Deltares
(leader).