Figure 7.2.
Schematic cross-section through study area, concentrations show t-As as measured in 2005.
Table 7.1. Geochemical parameter characterizing the site before starting the pilot
trial (October 2008).
Depth
Temperature
pH
EC
Eh
[ C]
[ µ Scm 1 ]
[m]
[ ]
[mV]
StO-01
10
11.1
6.8
431
26
StO-02
21
10.0
5.0
207
65
StO-04
21
9.8
4.3
216
245
StO-06
10
10.4
6.1
227
88
StO-07
21
10.0
5.3
210
168
StO-08
21
10.7
5.8
301
19
StO-09
15
10.3
4.3
252
102
Well 1
10
7.9
196
142
Well 2
14
8.0
211
132
The site is characterized mainly by acid groundwater (pH 4.3-6.8) as measured in a field
campaign from October 20-22, 2008. However, the site characterization at the two locations of
the remediation well shows slightly alkaline groundwater ( Table 7.1 ). The electrical conductivity
(EC) ranges from 196 to 431
Scm 1 . The redox conditions (Eh) is between 19 and 245 mV which
mean generally either iron & manganese reducing conditions or nitrogen reducing conditions.
This was verified by a campaign in 2006 where Fe(II)-concentration < 50
µ
gL 1 were found
while Fe(III) was not detectable (Holländer et al ., 2008). Furthermore, the campaign in 2008
gave for sulfate (SO 4 ) 42mgL 1 , for phosphate (PO 4 ) about 0 mg L 1 , and for silica (SiO 2 )
3mgL 1 .
Both remediation wells are bidirectional wells. For observation purposes, five observation
wells for sampling and monitoring of water parameters and levels have been installed ( Fig. 7.1 ) .