Lines of bolts every 150 mm
•
Significant amount of drilling of the soffit for the bolts
•
At least 12-14 possessions to carry out the work
•
Longer duration on site than CFP meant a cost of some £400,000
•
Extensive disruption to operations.
The Engineers and Client concluded that carbon fibre plates were the
most appropriate solution because:
•
They are a lightweight material
•
Fast, simple installation
•
Low risk during installation
•
Minimal plant requirements
•
Opportunity to carry out the works in normal rules of the route possessions
•
Minimal increase in overall depth of the slab (headroom maintained).