Civil Engineering Reference
In-Depth Information
Copper wire to plus terminal
Junction box with connection strip
Titanium wire
Titanium anode mesh
Copper wire and
Primary anode (
isolation
platinum
wire)
Concrete facade elements
Figure 6.6 Multiple connections to individual CP system parts should be preferred
(top) and series connections should be avoided (bottom).
Junction box exposed on beam head
Junction box sheltered below slab
Figure 6.7 Junction boxes should be placed in a sheltered position (bottom) and not
exposed, e.g. on beams heads (top).
 
 
Search WWH ::




Custom Search