with the elevation of the string corresponding to the spot elevations from
the grading plan. Figures 13.19-E and 3.19-F show the stage of construction
after the staking is complete and the forms have been positioned to the
proper elevations for the concrete to be poured. The contractor has ordered
delivery of the concrete, and the crew can be seen spreading it in Fig-
ure 13.19-F. Figure 13.19-G shows the concrete finishing working in prog-
ress, and Figure 13.19-H is the bus shelter project after the concrete has
dried and the forms have been removed. The work remaining is the finish
work for the bus shelter, installation of the landscape materials, and cleanup.
Figures 13.19 -I and J show the completed bus shelter and waiting area.
Figure 13.19 - G Concrete finishing work in progress
Figure 13.19 - h Completed concrete paving after wood
forms removed
Figure 13.19 - i Completed ADA access ramp and walk to
bus shelter
Figure 13.19 -J Completed bus shelter area