Environmental Engineering Reference
In-Depth Information
Fig. 6 Inspection costs of alternative investment-strategies.
Source
City of D
ü
sseldorf (
2013
,
p. 16), amended
(a)
(b)
50
45
40
35
30
25
20
15
10
5
0
Lengths of sewer
Share (cumulated)
1880
1890
1900
1910
1920
1930
1940
1950
1960
1970
1980
1990
2000
2010
Year of construction
Fig. 7 a Age structure of sewage main network of a German city (
(figure on the left
). b Survival
curves
for types of water mains (
(figure on the right
).
Source
a City of D
ü
sseldorf; b Herz and
Lipkow (
2002
)
running economic depreciation curves (Herz
1996
). With increasing planning
horizons and heterogeneity of networks, the insecurity of assumptions is increasing
and consequently the validity of results.
Long-term strategies for maintaining networks usually serve merely the principal
strategic alignment while the operative planning is principally based on technical
criteria. These day-to-day decisions impact only a few years; therefore life cycle
considerations only play a minor role.
Search WWH ::
Custom Search