Environmental Engineering Reference
In-Depth Information
Fig. 10
The BWRA process (Enhanced after David
2007
). The
open arrow
going down from the
green box
is directed to connect to the
Decision 6
:
Is vessel selected for CME process
? (see section
“
Decision 6: Vessel Selected for Compliance Monitoring and Enforcement Process?
”) (This fi gure
can be downloaded from
http://extras.springer.com/
)
Fig. 11
Decision (4) on whether or not the risk posed by the ballast water intended for discharge
is acceptable (This fi gure can be downloaded from
http://extras.springer.com/
)
option, retain the ballast water onboard, or in most critical situations to turn the vessel
away. All these decisions are dependent on the risk level posed by the ballast water
intended for discharge, by the vessel BWM options and the availability of alternative
BWM options (see Fig.
12
).
Search WWH ::
Custom Search