Graphics Programs Reference
In-Depth Information
have noticed the ShowMotion button on the Navigation bar.) And not only can you
create animated scenes, you can even add fancy transitions like jump cuts and
fades. I introduce you to shots (the non-potable kind!) and the ShowMotion com-
mand in Part V of this topic.
Follow these steps to create a named view:
1. Zoom and pan until you find the area of the drawing that you want to assign a
name to.
2. On the Ribbon's View tab, choose View Manager from the Views panel.
The View Manager dialog box appears.
3. Click New.
The New View / Shot Properties dialog box appears, as shown in Figure 12-4.
Figure 12-4: Save a view into your drawing.
4. Type a name in the View Name text box.
5. (Optional) Type a new category in the View Category box or select an existing
one from the drop-down list.
You create your own View Categories to organize views and certain display charac-
teristics of views. This feature is used mainly in sheet sets. If you aren't using sheet
sets, you can leave this box blank.
6. Make sure the View Type drop-down is set to Still.
Visit the online help if you want to know more about the Cinematic and Recorded
Walk options.
Search WWH ::




Custom Search