Civil Engineering Reference
In-Depth Information
Figure 9.21 3D analysis model of Liujiang Yellow River Bridge.
1265
2193
2193
−1347
−1347
−1212
−1212
−7898
−7898
5947
5947
8653
2194
2194
3804
3804
8653
5028
5028
(a)
5911
5911
6378 6739 6378
−11658 −11573 −11658
−13773
−13773
−14572
−14572
816
1108
1201
1184
1201
1108
816
−11761
(b)
8526
7865
7548
7865
8526
Figure 9.22 (a, b) Moment and axial force distribution due to dead loads without hanger
tension tuning.
Search WWH ::




Custom Search