Civil Engineering Reference
In-Depth Information
(a)
(b)
Figure 9.12 Vertical and horizontal rotation of Yajisha Bridge. (Courtesy of Guizhou
Bridge Construction Group Ltd.) (a) Half of the main arch is assembled on
false work at lower position along the river course. (b) Half of the main arch
is rotating vertically to its design position. (Continued)
Search WWH ::




Custom Search