3.3.4 A simple example of creep analysis
A three-span continuous bridge that is built span by span will be used as an
example here to illustrate the concrete creep behavior and the application
of time incremental analysis method. The example has three equal spans
with a span length of 30 m (Fan 1998). The first construction stage is the
casting of the first 36-m girder segment with the support of falseworks (first
span plus 6-m cantilever). The falseworks are removed after the concrete is
cured for one week. The second stage is to cast the next 30-m girder seg-
ment. After the concrete is cured for the same number of days (one week),
the last 24-m segment is cast as the last stage. The bridge is completed after
the last segment is cured for one week. The structural weight is 100 kN per
meter. In this model 3D frame elements are used.
Figure 3.13 shows moment distributions after the bridge is built when
creep effects are not considered. The moments at the first and second
interior bearings are −4,928 and −7,005 kN-m respectively. For compari-
son, both would be −9,000 kN-m if the three-span bridge is built all at
once. Figure 3.14 shows the final moment distributions eight years after
the bridge is built. Due to creep effects, moments at the interior bearings
become −8,283 and −8,926 kN-m, respectively, revealing the tendency of
concrete creep that the internal forces distributions would eventually be
−7005
−4928
−4066
−3738
−2267
−1800
−1528
−87
1
0
−5
0
610
928
1595
3662
5329
1855
2348
2332
2471
4542
6214
7485
8357
8828
8899
8571
7842
3257
3317
437
5040
5302 5163
4625
3686
4265
5185
5798
6714
659
7463
7930 7997
766
6931
Figure 3.13
Moment distribution of a three-span continuous bridge built span by span,
without consideration of concrete creep considered (kN-m).
−8926
−8283
−6084
−5526
−3169
−1212
344
−5531
−4931
−3641
−2536
−1979
−1598
0
44
0
58
2253
573
1287
1501
2258
2616
2573
2130
2204
2247
2725
4009
4095
5543
6591
4048
5443
4477
5414
5829
6438
7034
7229
7024
6419
7238
7486
7334
6782
Figure 3.14
Moment distribution of a three-span continuous bridge eight years after
built span by span, with consideration of concrete creep considered (kN-m).